SPORTS TURF CONTRACTING HAVE RECENTLY COMPLETED END OF SEASON RENOVATION WORK AT WIGAN ATHLETIC FC

SPORTS TURF CONTRACTING HAVE RECENTLY COMPLETED END OF SEASON RENOVATION WORK AT WIGAN ATHLETIC FC from  Sports Pitch Construction and Contractors 07980 604430-KORO-VERTI-DRAIN-SAND BANDING

By: Sports Pitch Construction and Contractors 07980 604430-KORO-VERTI-DRAIN-SAND BANDING  22/07/2009
Keywords: aeration, Pitch Construction, End of season renovation

 

 SPORTS TURF CONTRACTING LTD HAVE RECENTLY COMPLETED FULL PITCH RENOVATION WORK AT WIGAN ATHLETIC FC'S TRAINING GROUND.
The work was completed over a five day period in May this year and included Sand Banding 45,000m2 of pitches with The Blec Vibra-Tine Sand Master followed by Fraise Mowing of the 1st Team Pitch a Koro Field Top Maker and re-seeding.
Rob Turnbull, Head Groundsman at the Christopher Park Training Ground
is delighted with the results and says" Sports Turf Contracting Ltd are really professional and well equipped. We worked very closely with them to produce the specification beforehand and the finished job was excellent."

Keywords: aeration, Drainage design and installation, End of season renovation, Koro work, Pest/weed control, Pitch Construction, Sand-Banding,