Other examples of best work from Robore Cuts

Imperial War Museum from Robore Cuts thumbnail
01/08/2016

Imperial War Museum

IMPERIAL WAR MUSEUM Project Title: Imperial War Museum Location: Lambeth London Contract Length: 3 Months Scope of Works: Controlled Demolition of floor slabs Value: £150,000


Newcastle Tyne Tunnel from Robore Cuts thumbnail
01/08/2016

Newcastle Tyne Tunnel

NEWCASTLE TYNE TUNNEL Project Title: Newcastle Tyne Tunnel Location: Newcastle upon Tyne Contract Length: 3 Months Scope of Works: Under Water Cutting 26mts deep of Diaphragm Wall Value: £1.2 Million


Isle Of Grain from Robore Cuts thumbnail
01/08/2016

Isle Of Grain

ISLE OF GRAIN Project Title: Isle of Grain Location: Isle of Grain Kent Contract Length: 3 Months Scope of Works:


Paddington Crossrail from Robore Cuts thumbnail
01/08/2016

Paddington Crossrail

PADDINGTON CROSSRAIL Location: Paddington Central London Contract Length: 6 weeks Scope of Works: Partial removal of Basement Brickwork wall and


Olympic Stadium from Robore Cuts thumbnail
01/08/2016

Olympic Stadium

Location: Stratford, London Contract Length: 1 Month Scope of Works: Controlled Demolition using Robotic Demolition machines to remove Stadium Seating.


Surrey Lanes from Robore Cuts thumbnail
01/08/2016

Surrey Lanes

SURREY LANES Project Title: Surrey Lanes Location: Battersea London Contract Length: 1 week Scope of Works: Cut and Lift of


Royal Albert Hall from Robore Cuts thumbnail
01/08/2016

Royal Albert Hall

ROYAL ALBERT HALL Project Title: Royal Albert Hall Location: London Contract Length: 3 weeks Scope of Works: Soft Strip Demolition