Air Conditioning Energy Assessment (ACEA)

By: Business Energy Assessment  02/12/2010
Keywords: business, assessment, Energy Assessor

From  4th January 2011 all buildings, (Domestic and Non Domestic) with an air-conditioning system with an effective rated output of more than 12kw must be regularly inspected by an Energy Assessor. The inspections must be a maximum of five years apart. Systems first put into service on or after 1st January 2008, the first inspection must  take place within five years of the date when it was first put into service. For older systems,  the assessment must be performed before 4th January 2011. The effective rated output is calculated by adding the output of all systems within a building together.

Keywords: air conditioning report, assessment, business, Energy Assessment, Energy Assessor