By: Leengate Engineering Co 01/06/2011 Keywords: engineering, paint, Coatings
· Highly skilled, flexible work force· Lean Manufacturing designed into every process· Advanced technology, highly productive equipment· Low overheads, high asset utilization· Experience and commitment· Streamlined decision-making
· Highly skilled, flexible work force
· Lean Manufacturing designed into every process
· Advanced technology, highly productive equipment
· Low overheads, high asset utilization
· Experience and commitment
· Streamlined decision-making
http://www.leengate-engineering.co.uk
Email
Print this page
We have a vast manufacturing base of equipment featuring leading edge technology with our three automated Amada Load-Punch-unload cells, Eight